Welcome to EYONGPV Website.

Mobile +86 15024003838

Home > News > Industry News >

CIP and NZ Super Fund to set up 1 GW offshore project in New Zealand
Time: 2022-04-06


Copenhagen Infrastructure Partners (CIP), a Danish renewable investment group, has teamed up with the New Zealand Superannuation Fund (NZ Super Fund) to develop 1 GW of offshore wind capacity off New Zealand’s west coast.  The projected capacity, which will be located on the South Taranaki Bight, will be equivalent to more than 11 per cent of New Zealand’s current electricity demand. The project’s scope could be expanded to 2 GW in the future to satisfy the country’s predicted rise in electricity demand.

The two companies have formed a joint venture to manage the feasibility research and project development.  The South Taranaki project is part of CIP’s larger project development pipeline for CI V, the firm’s impending flagship fund.  Currently, the two companies are in the early phases of evaluating the project’s feasibility.

These include detailed environmental impact evaluations, wind resource measurement, and industry potential analysis, as well as Taranaki-specific training requirements. CIP and the NZ Super Fund will focus on methods to ensure that the planned project can coexist with other uses of the marine area during the study.


Follow us
Facebook
Twitter
Instagram
LinkedIn
YouTube
Products
Foldable Solar Panels
Flexible Solar Panels
Custom Solar Panels
Standard Series
Portable Power Stations
Solar Lamps
About Us
About Us
Why EyongPV
Factory Tour
SUPPORT
Technical Support
Warranty
News
Company News
Industry News
Contact us
E-mail : sales@eyongpv.com
Mobile: +86 15024003838
No. 4 Xiaolong Road, Henglang Community, Dalang St., Longhua District, Shenzhen, China
Copyright © EYONGPV LIMITED All Rights Reserved.